New
Apps 6,340Makers 6,319This week 13
Promote your app−30%
VibeOps screenshot 1
1views in
the last 30 days

VibeOps

Workflow rails for Cursor-based vibe coding projects

Built with Claude Code

by goodtek-xyz · Unclaimed · added Oct 29, 2026
no ratings0 comments

Minimal CLI rails for TASK-driven vibe coding (Claude Code, Codex, Cursor).

VibeOps bootstraps an agent-friendly repo, starts numbered TASK files on Git branches, and runs a clear GitFlow lifecycle. You plan and implement in your chosen agent; the CLI handles files, Git, and short LLM assists.

Current release: @goodtek/vibeops@2.5.1 — interactive init remote (GitHub/GitLab), state-aware task ship only (no task reship), status Now/Next card, clearer task add integration sync errors.

Commands

Command Purpose
vibeops init Core docs + agent packs; interactive Git host + create/connect remote
vibeops task add New TASK-NNN file + task branch
vibeops task del Cancel TASK before merge (md + branch + close open MR)
vibeops task ship State-aware submit: new PR · update open PR · new PR cycle after merge (Status → Shipped)
vibeops task merge Merge TASK MR/PR into integration branch (default: squash)
vibeops task sync After merge: ff-only integration pull, delete task branches (no TASK md edits)
vibeops task release Release PR: integration → production (GitFlow)
vibeops pull Fetch remote + update integration branch (e.g. develop)
vibeops status Now / Next card — focus TASK, checklist, what to run next
vibeops llm Connect LLM providers (connect · status · use)

Installation

Node.js 20+.

npm install -g @goodtek/vibeops@2.5.1
# or latest: npm install -g @goodtek/vibeops
vibeops --version   # expect 2.5.1

If vibeops --version stays on an old release after install, check for a shell alias or Volta shim shadowing npm:

type -a vibeops
# alias → unalias vibeops (and remove from ~/.zshrc)
# ~/.volta/bin/vibeops → volta install @goodtek/vibeops@2.5.1

Upgrading from before 2.5: task reship was removed. Use vibeops task ship (re-run while the PR is open; after merge use confirm or --new-cycle).

Development:

pnpm install && pnpm build && pnpm smoke

Init

Interactive init asks which agents to install, Git branch policy, then where the remote lives (GitHub / GitLab / skip) and whether to create or connect a repository. If gh/glab is missing, init prints install hints (optional brew install with consent) or accepts a URL — it does not block the rest of VibeOps.

# Interactive: pick agents (≥1), then Git + remote host
vibeops init

# Non-interactive (GitFlow: develop + main, origin required unless CI)
vibeops init --clients claude,codex,cursor --git --initial-commit --git-policy gitflow --allow-no-remote

# Re-init templates on an existing project
vibeops init --clients cursor --yes
Pack Installed
core (always) AGENTS.md, docs/tasks, docs/project, docs/logs
claude CLAUDE.md, .claude/skills/
codex .agents/skills/
cursor .cursor/rules/, .cursor/skills/

Re-init overwrites templates (rules, skills, doc stubs). docs/tasks/TASK-*.md are kept.

Workflow

vibeops init --clients cursor --git --initial-commit

vibeops task add
# Plan / build in Cursor (@docs/tasks/TASK-NNN-*.md)

vibeops task ship
vibeops task merge
vibeops pull
# Same TASK, before merge — edit, then just re-run ship (updates the open PR):
vibeops task ship -m "address review"
# Same TASK, after merge — start a new PR cycle:
vibeops task ship --new-cycle
vibeops task merge
vibeops task sync
vibeops task add

ship detects the TASK's PR state and does the right thing:

State ship does Output
No PR yet push + open a new PR Created PR #<n> → <url>
PR open (unmerged) commit + push the same branch (no new PR), CI re-runs Updated existing PR #<n> (pushed <sha>) — CI re-running
PR merged start a new PR cycle (needs confirm or --new-cycle) Started new PR cycle → PR #<n>
No change no-op Nothing to ship (working tree clean, PR #<n> up to date)

Occasionally (GitFlow release to production):

vibeops task release

Only one TASK In Progress at a time (task add blocks otherwise). Shipped slices do not block the next add; merge on the host or with task merge, then optional task sync.

task add fast-forward-pulls the integration branch first. If that fails (diverged / app dirty / local-ahead), it prints the cause and fix commands and does not create a TASK file. VibeOps/governance-only changes (e.g. .vibeops.json after init) do not block. If a previous run left a TASK file without a branch, rerun task add to resume.

Status

vibeops status

Prints a short card:

  • NOW — focus TASK, stage, Result/Test checklist, branch, PR
  • NEXT — one primary action (copy-pasteable command)
  • footer — project, task counts, LLM (dim)
vibeops status --json   # machine-readable

LLM (optional)

For task add / task ship only (not for coding in the IDE). When -m is omitted, ship uses a connected provider to draft the commit subject:

vibeops llm connect
vibeops llm use auto   # auto | codex-oauth | cursor-agent | openai

Flags (common)

  • init: --clients, --yes, --dry-run, --force, --git, --initial-commit, --git-policy gitflow|trunk, --integration-branch, --production-branch, --git-host github|gitlab, --allow-no-remote, --cwd When init creates the repository on GitHub / GitLab (interactive), it pushes main and the integration branch and makes the integration branch (develop with the GitFlow preset) the repository's default branch; an existing repository's default branch is not changed.
  • task add: --dry-run, --non-interactive --idea "…"
  • task del: --dry-run, --force, --no-remote-delete, --no-close-mr
  • task ship: -m/--message, --new-cycle, --no-commit, --dry-run, --no-pr, --non-interactive, --allow-open-mr, --no-integrate, --recreate-branch, --skip-llm
  • task merge: --dry-run, --merge, --rebase
  • task sync: --dry-run, --no-remote-delete, --force
  • task release: --dry-run, --no-merge, --merge, --rebase, --tag (after the merge, tag the release merge commit v<package.json version> and push it; never moves an existing tag)
  • pull: --dry-run
  • status: --json

Git

  • Init records branch policy in .vibeops.json (integrationBranch, productionBranch, host). Interactive remote setup: ask GitHub/GitLab, create or connect; soft-gate when gh/glab is missing.
  • task add: task/<NNN-slug> from <remote>/<integration> (e.g. origin/develop), after git fetch. See Worktrees and TASK ids.
  • task ship (state-aware): no PR → commit + ship metadata (Status Shipped) → push → open MR/PR; open PR → commit + push the same branch, CI re-runs, no new PR; merged PR → new PR cycle (carries uncommitted work onto the task branch, integrates develop, opens a new PR). Use --new-cycle in non-interactive mode. Commit messages are TASK-id-scoped (feat(task-001): …). Refuses when HEAD is not the task branch.
  • task merge: merge MR/PR into integration (TASK md unchanged) — only when every check is green (see Merge gate).
  • task sync: verify merge → leave the task branch (switch to integration, or detach at <remote>/<integration> when another worktree owns it) → fast-forward local integration where safe → delete local + remote task/* branch (TASK md unchanged).
  • pull: fetch + switch to integration branch + git pull --ff-only (one command). Refuses (exit 1) when another worktree has the integration branch checked out — run it there.
  • task release: integration → production PR + merge (skipped on trunk policy). Reuses the open release PR when there is one; the merge waits for that PR's own CI like task merge.
  • status: Now / Next card — focus stage, checklist, PR, and the next command to run.
  • No force-push to shared branches.

Worktrees

VibeOps supports several git worktree checkouts of one repo working in parallel. It never needs to check out the integration branch:

  • New task branches start from <remote>/<integration> (git switch -c task/NNN-slug --no-track origin/develop).
  • The local integration branch is fast-forwarded only when safe: in the worktree that has it checked out (merge --ff-only), otherwise with git fetch . refs/remotes/origin/develop:refs/heads/develop, which git refuses for non-fast-forward updates and for a branch checked out in another worktree — then it is left alone and the log says so (update it in that worktree).
  • task sync / task del / task ship --new-cycle leave the task branch by detaching at <remote>/<integration> when the integration branch is checked out elsewhere.
  • Governance changes set aside for a branch switch are restored by stash SHA, never by stash pop (the stash list is shared by all worktrees). Untracked files are not stashed.
  • Nothing is ever forced; local integration commits that are not on the remote stop task add / task sync with fix commands.

Repository lock

task add, task sync, task del, task ship --new-cycle (branch step) and vibeops pull take an exclusive lock, <git-common-dir>/vibeops-task.lock (shared by all worktrees), recording pid, host, start time, operation and directory. A second command waits, then fails with a message naming the holder.

  • The lock file is created atomically with its content (temp file + link), so it is never seen half-written.
  • Stale = holder on this host whose pid is not running, or a lock older than staleSeconds (any host; covers pid reuse). A start time in the future (clock skew) is respected, not stale.
  • Every removal (release or stale takeover) happens under a short breaker file vibeops-task.lock.break and only after re-checking the lock's inode and token, so concurrent takeovers of one stale lock never yield two holders.
  • Breaker timings are internal (not in .vibeops.json) because the breaker is held for microseconds and only matters after a crash: a breaker older than 30 s is treated as left by a crash; waiting for it is bounded by 60 s (a stale takeover waits at most waitSeconds; a release always uses the full 60 s so the lock is not left behind).
  • The git common dir must be on a local filesystem. Network filesystems (NFS, SMB, cloud-synced folders) are not supported: their link / rename / O_EXCL semantics and clocks are not reliable enough for the lock.
.vibeops.json lock key Default Allowed Meaning
waitSeconds 60 integer 0–600 How long to wait for another holder.
staleSeconds 600 integer 60–86400 A lock older than this is stale (any host). On this host a lock is also stale as soon as its pid is no longer running.

TASK ids

task add picks 1 + the highest TASK number found anywhere so parallel worktrees and unmerged branches never reuse an id:

  1. docs/tasks in this worktree (including uncommitted files);
  2. docs/tasks on <remote>/<integration> (git ls-tree);
  3. docs/tasks in every worktree (git worktree list) — covers task branches whose TASK file is not committed yet;
  4. VibeOps task branches, local and on the remote (git fetch --prune <remote> '+refs/heads/task/*:refs/remotes/<remote>/task/*').

A branch counts only when its name has the generated form task/<NNN> or task/<NNN>-<slug> — NNN is the TASK number zero-padded to at least 3 digits, slug is lowercase a-z0-9 words joined by single hyphens (exactly what task add creates from TASK-<NNN>-<slug>.md) — and its tree contains docs/tasks/TASK-<NNN>…md. Other branches (task/2026-q4-plan, task/task-020-x) are ignored.

If a configured remote cannot be fetched, task add stops without creating a TASK file. Across machines, task ship re-checks the remote (git ls-remote) right before pushing and refuses if another task branch with the same number already exists there.

Baseline checks

task add and task ship first check that the repository follows the VibeOps flow (.vibeops.json → baseline):

Check OK when
branch-policy git.integrationBranch ≠ git.productionBranch (e.g. develop → main)
default-branch the remote's default branch (git ls-remote --symref <remote> HEAD) is the integration branch
personas with baseline.crew set: .personas/<crew>/SOURCE exists
agents-contract with baseline.crew set: AGENTS.md has the <!-- getpersona:<crew> --> section
{ "baseline": { "mode": "warn", "crew": "vibe-crew" } }
  • mode: warn (default — print each failing check with a fix and continue), enforce (stop with exit code 1, nothing created or pushed), off.
  • crew: persona crew to require; omitted → the crew checks are skipped.
  • vibeops status shows the same checks (Baseline …), the crew's pinned catalog commit, and remote branches other than integration / production / task/* / sync/* (status --json → baseline).
  • The block is validated strictly (unknown keys / values are errors and stop the command).
  • Repairing in enforce mode: vibeops task add --repair-baseline opens the TASK anyway (failures shown as warnings for that command only) and writes a ## Baseline section ("Repair …") into the TASK file; task ship of that TASK goes through only when every baseline check passes, whatever baseline.mode is.

Merge gate

3.0.0 breaking: a PR/MR with no checks at all is refused by default. Repos without CI: set "merge": {"allowNoChecks": true} in .vibeops.json. Requires gh ≥ 2.13.0.

task merge and task release are a client-side CI gate (useful when the host plan has no branch protection / required checks, e.g. private GitHub repos on the free plan). Where server-side branch protection / required checks are available, enable them — the host remains the final authority; this gate only stops VibeOps itself from merging red work (a human can still merge in the host UI).

Before calling gh pr merge / glab mr merge:

  • GitHub: every item in the PR statusCheckRollup is classified from GitHub's documented enums — CheckRun (Actions) by status + conclusion, StatusContext by state:
    • passed: SUCCESS, NEUTRAL, SKIPPED
    • failed: FAILURE, CANCELLED, TIMED_OUT, ACTION_REQUIRED, STARTUP_FAILURE, STALE, ERROR
    • pending: CheckRun REQUESTED, QUEUED, IN_PROGRESS, WAITING, PENDING; StatusContext PENDING, EXPECTED
    • anything missing or undocumented fails closed (treated as failed). Several checks with the same name: any failure fails.
  • GitHub Actions — the PR's own CI, not leftovers: the rollup lists every check on the head commit, including checks from other events (e.g. a finished push workflow on develop when a release PR develop → main is opened). Right after a PR is opened or pushed, GitHub has not created its pull_request run — or that run's jobs — yet, so such a rollup looked green and 3.1.x merged before CI started. The gate therefore also reads the GitHub Actions API for the head SHA:
    • Expected workflows: every .github/workflows/*.yml|yaml at the head commit whose on: triggers pull_request for this PR, using GitHub's filter rules — branches / branches-ignore against the base branch, paths / paths-ignore against the PR's changed files (first 300, like GitHub), and types (a custom list must contain both opened and synchronize). Disabled workflows are skipped; pull_request_target, workflow_call and other events are not awaited. Each expected workflow must have a pull_request run for the head SHA — until it appears the gate waits (workflow … (pull_request) has not started for <sha> yet), then refuses at waitTimeoutSeconds.
    • All runs for the head SHA (any event, latest run per workflow + event) must be completed with success, neutral or skipped. A queued / in-progress / waiting run waits; any other conclusion refuses immediately — including startup_failure (no jobs, so nothing in the rollup) and action_required (fork PR awaiting approval).
    • The Actions API is required: if it cannot be read, the gate keeps waiting (back-off) and refuses at the timeout — it never merges blind.
  • Dynamic workflows are not CI: runs GitHub generates on the fly — event: dynamic, e.g. dynamic/dependabot/dependabot-updates, the jobs that open Dependabot PRs — and check runs suffixed (dynamic) are ignored. GitHub documents them as "generated for a specific run and … not stored in your repository's .github/workflows directory" (Dependabot on GitHub Actions runners); a failed one says nothing about the commit and cannot be re-run. A (dynamic) check named in requiredChecks is still required.
  • GitLab: the MR head pipeline must be success or skipped. failed, canceled, manual and unknown statuses refuse; created / pending / running / scheduled / … wait.
  • Host output is verified: if gh pr view lacks or has empty state, mergeable, headRefOid, or statusCheckRollup is not a list (GitLab: state, sha, merge_status, detailed_merge_status, head_pipeline), the merge is refused.
  • Failed check → refuse immediately (exit code 1, checks named). Pending → wait up to waitTimeoutSeconds, then refuse. There is no override flag: fix CI (re-run task ship) and rerun task merge.
  • No checks at all → refuse unless allowNoChecks: true. "No checks" means: empty rollup, no GitHub Actions run and no expected workflow for the head commit (GitLab: no pipeline). For CI outside GitHub Actions (commit statuses / check apps), list such checks in requiredChecks so the gate waits for them by name (emptyRollupGraceSeconds, default 0, can re-poll an empty list first).
  • Waiting polls the host (gh pr view + the Actions REST API) every pollIntervalSeconds (default 10 s, the default of gh pr checks --watch) until the state changes, bounded by waitTimeoutSeconds (default 21600 s, the GitHub-hosted job limit). Host read errors back off exponentially with jitter (capped at 60 s, GitHub's guidance for rate-limited clients).
  • After the merge: gh pr merge / glab mr merge return the result synchronously (GitHub merged: true, GitLab state: "merged"), so VibeOps reads the PR/MR once to confirm. Not merged at that point (merge queue / auto-merge) is reported, not waited for.
  • The merge is pinned to the checked commit: right before merging the gate re-reads the PR head; if it moved, the new head is evaluated from scratch. The merge itself uses gh pr merge --match-head-commit <sha> (requires gh ≥ 2.13.0) / glab mr merge --auto-merge=false --sha <sha> (verified with glab 1.106), so a push between the last check and the merge makes the host refuse. A GitLab 405 re-runs the gate and retries once with the same flags.
  • Unreadable Git Context stops task ship / task add: a TASK file whose ## Git Context cannot be read (e.g. an edit left ## ## Git Context) makes task ship exit 1 before committing or pushing, naming the line; task add refuses to "resume" such a TASK (it would write a second section) and names the file and line.
  • task merge refuses a stale base: the head commit the gate approved must contain the current <remote>/<base> (git merge-base --is-ancestor, after fetching the base branch and the head commit). A head that does not — the base moved since the branch was pushed, or

Description taken from the repository README.

Ratings

–
0 ratings
5 0
4 0
3 0
2 0
1 0

Rate this app

Sign in to rate

Comments 0

Sign in to comment

No comments yet.

Related apps

#automation · #project-management